Cooling Load Estimator
Estimate cooling load, equipment tonnage, ventilation impact, and safety margin.
Open ToolA multi-method airflow calculator that compares air change, people-based ventilation, and cooling-ton based airflow methods.
An airflow and CFM calculator compares common HVAC airflow methods so the governing requirement is easier to see. It calculates airflow from air changes per hour, people-based ventilation, and cooling tons, then applies a design margin to the largest relevant value. Engineers use it when ACH, occupancy, and cooling-load rules point to different airflow quantities and the design team needs a clear planning number. It helps with room ventilation checks, supply air estimates, exhaust comparison, diffuser planning, and early AHU or FCU coordination. The result is a planning airflow only. Final design still needs ventilation code compliance, thermal load calculation, pressure loss, air distribution, filtration, acoustic limits, equipment selection, and local authority requirements. For best results, keep the entered units consistent, load the sample first, then adjust one assumption at a time so the result can be reviewed and explained.
Forms are empty on load. Use sample data to preview the workflow or enter your own project values.
Formula logic, use cases, assumptions, and limits for this tool.
Use this when different airflow methods give different answers. The recommended planning airflow is based on the governing method plus margin.
This tool provides a planning-level result. It does not replace detailed engineering design, approved software, manufacturer data, authority requirements, or project specifications.
Read the recommendation, warning, and confidence sections together. A result without warnings is still not an approval; it only means the entered values did not trigger built-in planning alerts.
These notes explain what each input means and which values usually produce a more reliable planning result.
Selects the planning profile used for conservative defaults. Use the project authority or client standard where known; otherwise use the closest regional profile. Options: GCC project planning, ASHRAE planning, CIBSE planning.
Measured floor area used by the calculation. Use drawing or measured values; small rooms are often 10-30 m2, large commercial zones may be hundreds or thousands of m2.
Clear internal height or equipment height. Typical occupied rooms are 2.7-3.2 m; warehouses, atria, and plant rooms can be much higher.
Air changes per hour. Offices may be low single digits; toilets, kitchens, exhaust rooms, and plant rooms often need higher ACH by code and use.
Expected number of people using the space. Use realistic peak occupancy, not only average daily occupancy.
Fresh air per person. Typical planning values are often 15-25 CFM/person, subject to ASHRAE, CIBSE, local code, and room use.
Cooling capacity in refrigeration tons. 1 TR equals about 3.517 kW; use calculated load where possible, not only area rule of thumb.
Supply airflow per refrigeration ton. A common planning range is 350-450 CFM/TR; 400 CFM/TR is often used for comfort cooling checks.
Design safety margin. 5-15% is common for planning; excessive margin can oversize equipment, cables, pumps, or tanks.
Compares ACH-based airflow, occupant ventilation airflow, and cooling-ton airflow, then applies design margin to the governing value.
Inputs are treated as planning assumptions. The calculator shows warnings when entered values fall outside practical thresholds or selected standard-profile limits.
Stage 2 roadmap: optional saved projects, dashboards, and shared calculation history without forcing login for free use.
Every result includes assumptions, warning logic, and a downloadable report. Final engineering decisions still need qualified review, local authority approval, manufacturer data, and project specifications.
Use the sample data button to load a realistic scenario, then download the PDF report to review inputs, results, methodology, warnings, and disclaimers in one place.