Cable Sizing & Voltage Drop Planner
Check current, selected cable ampacity, voltage drop, and minimum cable guidance.
Open ToolPower, fire alarm, ELV, cable sizing, transformers, generators, CCTV, UPS, access control, loop/battery planning, and DIP switch addressing.
Cable, load schedule, transformer, generator, and power factor tools.
Check current, selected cable ampacity, voltage drop, and minimum cable guidance.
Open ToolBuild connected load, demand load, kVA, spare capacity, and panel-size guidance.
Open ToolCalculate required transformer kVA, standard size, loading percentage, and spare margin.
Open ToolEstimate generator kVA using running load, starting load, diversity, and spare margin.
Open ToolCalculate capacitor kVAR, current reduction, transformer relief, and simple payback.
Open ToolBattery backup, loop-load, and DIP switch addressing tools for fire alarm systems.
Calculate standby Ah, alarm Ah, derating, spare margin, and recommended battery size.
Open ToolCheck device count, loop current, capacity usage, address usage, and spare margin.
Open ToolConvert fire alarm device addresses into DIP switch ON/OFF positions and binary value checks.
Open ToolCCTV, UPS, rack power, and access control planning tools.
Calculate CCTV retention storage by camera count, bitrate, recording hours, RAID, and spare.
Open ToolEstimate rack load, UPS kVA, heat output, and battery energy requirement.
Open ToolBuild controller, reader, lock, REX, contact, PSU, and battery quantities.
Open ToolCalculate conduit fill percentage for cable and raceway planning.
Open ToolEstimate transformer secondary fault current for breaker duty checks.
Open ToolEstimate required lumens and luminaire count from lux target and area.
Open ToolEstimate breaker rating from load current, voltage, phase, and safety margin.
Open ToolConvert kVA to amps for single-phase and three-phase electrical loads.
Open ToolEstimate derated cable ampacity from temperature, grouping, and installation factors.
Open ToolThese tools are intended for planning, estimation support, technical checking, and preliminary decision-making. They do not replace authority-approved calculations, engineering judgement, manufacturer data, or project-specific specifications.